1
/
of
8
UTOPIAHOME
Utopia Home Velvet Hangers, Burgundy, 20 Pack | Luxury Non-Slip Slim Pant & Coat Hangers, Strong Space-Saving Clothes Hangers with Pants Bar and 360° Swivel Hook
Utopia Home Velvet Hangers, Burgundy, 20 Pack | Luxury Non-Slip Slim Pant & Coat Hangers, Strong Space-Saving Clothes Hangers with Pants Bar and 360° Swivel Hook
Regular price
$31.98 USD
Regular price
Sale price
$31.98 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Velvet Clothes Hanger: Set of elegant velvet hangers, each measuring 17.5 x 0.24 x 9.06 inches. Made from sturdy ABS material that is strong enough to hold 10 pounds
- Slim Design: These stylish 360-degree rotating velvet hangers add sophistication to your wardrobe, and the slim design ensures a neat and minimalist look
- Sturdy Hook: The strong and elegant metallic hook has a refined chrome finish that enhances your wardrobe embellishment
- Space Saving: Our sleek and stylish velvet hangers help you maximize space so you no longer have to deal with a cluttered look
- Non-Slip Surface: The velvet-coated surface of the hangers prevents your suits, pants and delicate blouses from falling and offers you wrinkle-free attire for your day-to-day fashion statement
- Complete Set: Package includes 20 premium velvet hangers in burgundy color, each equipped with a pants bar for versatile hanging options
- Durable Construction: Heavy-duty construction with reinforced design ensures long-lasting performance and reliability for your entire wardrobe collection
Overview
- Color : Burgundy
- Brand : Utopia Home
- Material : Plastic
- Product Dimensions : 17.5"W x 9.06"H
- Special Feature : 360 Rotatable Metal Hook, Anti-Slip, Clothes Hangers, Space Saving, Suit Hangers
Share
No reviews
